Proven Where It Matters Most
County commissioners have seen plenty of products fail—our road and soil treatment is here to be their solution. Here’s what one client has to say about using SoilPak-250 on county roads.
Gary Starns, County Commissioner, Pontotoc County, OK
The Numbers Behind a Stronger Road
hr
24 hours to harden and seal out water.
gal.
Average of 60 gallons of chemical used per mile.
days
Cured in 7-13 days, depending on weather.
%
60-70% lower cost than other materials.
Figures are approximate and vary by project, soil type, and weather conditions.
Tailored to Your Soil
No two roads have the same conditions, so no two jobs get the same treatment. That’s why SoilChem starts every project with your soil.
1
Test the Soil
We take samples along the road and test them in our laboratory.
2
Set the Rate
The results determine the mix rate, so each road gets what it needs.
3
Till the Chemical In
SoilPak-250 is mixed with water and tilled about 8 inches into the road base.
4
Compact & Finish
The road is crowned and compacted while our team checks the work.

Ready Wherever You Are
County crews, parish road departments, and state agencies across the country count on our chemical for roads that handle heavy traffic, rail lines that span major areas, and more.
Across the USA

The First Choice for Counties and Government Agencies
Fayetteville
Washington County, Arkansas
Cedar Point
Chase County, Kansas
Goldsby
McClain County, Oklahoma

The Science Behind a Waterproof Base
Clay soaks up water like a sponge, swells, and breaks down under traffic. Developed by two of the nation’s top chemists, SoilPak-250 changes the clay's surface charge so it sheds water instead.
It’s also biodegradable, non-toxic, and non-corrosive to your equipment.

Cured Test Sample

Water Stays on Top
Stabilizing Roads, Lots, and Yards Across the United States







Find Out What Your Jobsite Needs
SoilChem is ready to give your project the foundation it needs to last. Connect with us to learn more.

